Construction Business Lunch × BENOR · Wednesday 9 December · BrusselsSave my seat 

Every tonne traceable.
Every euro explained.

How we build a carbon account your auditor can follow and an action plan your CFO can finance: the standards we apply, where every factor comes from, what AI does and what our experts sign off, and how sure we are of each figure.

  • GHG Protocol · ISO 14064-1
  • Bilan Carbone® Conform (BC-C)
  • Official BENOR partner
Where this figure comes from
Illustrative example
  1. 1 · Source document

    Electricity_2025.pdf · page 2

    Ghent plant · 01/01–31/12/2025
    Active energy, total ........ 526,000 kWh

  2. 2 · Activity data

    526,000 kWh · Ghent plant · 2025

  3. 3 · Emission factor

    × 0.222 kgCO₂e/kWh · Grid electricity, Belgium

    Database · version · year · geography stored with the line

  4. 4 · Result

    116.8 tCO₂eGHG Protocol: Scope 2Bilan Carbone: Energy

Uncertainty: lowMatched by AI, checked by an expert

Standards

The frameworks behind every figure.

One set of activity data, read through the framework each audience expects: your auditor, your customers, your bank or a public tender.

Who reads it:

Process

How a carbon account is built.

Six steps, the same every year. Each one leaves a written trace, so next year's figures can be compared with this year's.

Step 01 of 06

Set the boundaries.

Before a single invoice is read, we agree with you on what is in and what is out, and why.

What we decide together

  • Consolidation approach: operational control by default, financial control or equity share if your group reports that way
  • Entities, sites and activities included
  • Reporting year and base year
  • All seven Kyoto gases, refrigerant leaks included
  • Screening of the 15 Scope 3 categories, with the reason for each exclusion

What you get

  • A boundary note, signed off by you
  • The list of data to collect, per site and per person

Traceability

Follow one line from the invoice to the report.

Pick a line. Switch the framework. For electricity, switch the Scope 2 method. The tonnes are always the same; only the way they are read changes.

Framework
Scope 2

1Source document

PDFElectricity_2025.pdf · p. 2

Ghent plant · 2025

2Activity data

526,000 kWh

Metered consumption

3Emission factor

× 0.222 kgCO₂e/kWh

Grid electricity, Belgium · average mix

4Result

116.8 tCO₂e

Read through the GHG Protocol

Scope 2 · Purchased electricity · location-basedData type: metered

Data quality · 5 GHG Protocol criteria

  • Technology
  • Time
  • Geography
  • Completeness
  • Reliability

Uncertainty: low

What it tells you

Location-based shows the emissions of the grid you draw from. It is the figure to compare sites and years.

Illustrative example. Same Example company as on our Solutions pages.

Emission factors

The best available factor, for every line.

Not every line deserves the same effort. We use the most specific factor we can get, and we tell you where a generic one is still in use.

  1. Supplier-specific

    Your supplier's product footprint or EPD, or your own energy contract. The most precise.

    Best
  2. Product and process averages

    Recognised databases, per material, fuel, process and country.

    • Base Empreinte® (ADEME)
    • ecoinvent
    • INIES
    • DESNZ
    • AIB
    Standard
  3. Physical estimates

    A quantity estimated from a proxy (m², km, headcount) when a meter or invoice is missing. Flagged as an estimate.

    Flagged
  4. Spend-based

    Euros spent × a sector factor. Only as a starting point for Scope 3, flagged, and replaced year after year.

    Last resort
  • Every factor is stored with its source, version, year and geography.
  • A database update never silently changes a closed year.
  • Your supplier data replaces the average as soon as it is checked.
  • Biogenic CO₂ is reported separately from the scopes.
Scope 3 · share by type of factorExample company, over three reporting years

Illustrative example. Share of Scope 3 tonnes.

Uncertainty

We tell you how sure we are.

A footprint without uncertainty looks precise and decides badly. Every line gets a quality score on the five GHG Protocol criteria, and the uncertainties are combined into a range for the total.

Technology
Does the factor match the real process or product?
Time
Is the data from the reporting year?
Geography
Is the factor for the right country or grid?
Completeness
Does the data cover all sites and all months?
Reliability
Measured, calculated, or estimated?
Example company · 2025 · Illustrative example

601 tCO₂e± 9%

95% confidence range544 – 658 tCO₂e

Measured or calculatedAverage factor or estimate

LineEmissions and 95% rangeValueShare of ±
Steel sheet132.3 ±30%49%
Electricity116.8 ±5%1%
Natural gas112.2 ±5%1%
Trucks, outbound72.4 ±5%<1%
Buildings72.0 ±50%40%
Steel profiles45.6 ±30%6%
Trucks, inbound32.2 ±5%<1%
Machines18.0 ±50%3%

95% confidence. Line uncertainties combined as independent errors. “Share of ±” is each line's part of the total uncertainty.

Improve first: Steel sheet and Buildings carry 89% of the uncertainty. With product footprints from your two steel suppliers (±10%), the total goes from ±9% to about ±7%.

AI and experts

AI reads. Experts decide.

AI takes the repetitive work: reading, extracting, matching. Every choice that changes a figure stays with a person who knows carbon accounting.

What AI does

Fast, consistent, every year.

  • Reads invoices, meter files, fuel cards and ledgers as they are
  • Extracts quantities, units, periods and sites
  • Proposes an emission factor, with its confidence
  • Flags gaps, duplicates and unusual values

What our experts do

Judgement, accountability, sign-off.

  • Set the boundaries and the Scope 3 screening with you
  • Approve or correct each proposed factor
  • Review high-weight and low-confidence lines
  • Sign off the results and explain them to your teams
Factor matchAwaiting approval

Gas_invoice_2025.pdf · Ghent plant555,400 kWh

AI proposes

Natural gas, combustion0.202 kgCO₂e/kWh

IPCC default · Scope 1 · stationary combustion

Confidence94%

Line result112.2 tCO₂e

Approved by a D-Carbonize expert. Logged in the audit trail.

  • A person approves every factor match.Nothing enters the account on AI alone.
  • Missing data is flagged, not guessed.Gaps stay visible until they are filled.
  • Every suggestion shows its source.Click a figure, see the document line.
  • Your data stays in the EU.Never used to train AI models.

From tonnes to euros

The same rigour for the euros.

A reduction plan is an investment plan. Each measure is costed with the same traceability as the tonnes, and every assumption is written down and dated.

CAPEX
From quotes or reference costs, spread over the measure's lifetime
Savings
Energy and operating costs avoided, at stated prices
Payback
CAPEX divided by yearly savings
€ per tCO₂e
Net yearly cost divided by tonnes avoided. Below zero, the measure pays for itself
Subsidies
Included when you are eligible, with the scheme named

Heat recovery · Ghent plantCuts gas use by 30%: 167 MWh a year

Example company
CAPEX
€35k
Yearly savings
€7.5k
Payback
4.7 years
Avoided
33.7 t/yr

Cumulative cash, undiscounted+€40k after 10 years

−€40k€0k+€40k+€80kYr 0Yr 2Yr 4Yr 6Yr 8Yr 10Payback 4.7 yrs−€35k CAPEX
€45/MWh
Cost per tonne avoided

( €3.5k CAPEX / yr − €7.5k savings ) ÷ 33.7 tCO₂e = −119 €/t

Below zero: the measure saves €4.0k a year, net of its cost.
  • Gas price: €45/MWh · 2026
  • Lifetime: 10 years, undiscounted
  • No carbon price
  • Subsidy: none applied

Our limits

What we don't do.

A method is also defined by its refusals.

We don'tWhat we do instead
Count offsets as reductions.

Offsets, if any, are reported apart. Your footprint only goes down when your emissions do.

Present estimates as measurements.

Every estimate is labelled as one, with the proxy it comes from.

Hide uncertainty.

You see the range of the total, and which lines it comes from.

Let AI decide alone.

A person approves every factor match, and the approval is logged.

Lock your data in.

Your lines, factors and reports export in open formats.

FAQ

Questions auditors ask us.

Both. The GHG Protocol asks for both figures. Location-based reflects the grid you draw from; market-based reflects your contracts and guarantees of origin. Both are always available. You choose the one that drives your targets, and you keep it from year to year.

We screen all 15 categories of the GHG Protocol Scope 3 Standard. Relevant ones are calculated; the others are documented with the reason they are excluded. For most industrial companies, purchased goods and transport dominate. For makers of energy-using products, so does the use of sold products.

After an acquisition, a divestment or a method change that moves total emissions by 5% or more, the base year is recalculated so that the trend stays comparable. The reason and the impact are written into the report.

Yes. It is built to be verified by an independent body, with limited or reasonable assurance (ISO 14064-3, ISAE 3410). We do not verify our own work.

Yes. Every line links to its source file, its factor and the person who approved it. Your auditor can get read access to Carbon Cockpit or receive a full export.

Yes. We import it, check the boundaries and factors, and tell you what can be kept and what needs to be redone to stay comparable.

Usually both, for different readers. They use the same activity data and classify it differently. We produce both from the same lines, and reconcile them line by line.

Next step

See the method on your own data.

Thirty minutes, screen shared, with a D-Carbonize expert. Bring one invoice and one question.

  • 300+companies
  • 59countries
  • 4.8/5 Capterra

Your 30-minute session

  1. 0:00Your boundaries and your reporting needs
  2. 0:10One of your invoices, traced line by line
  3. 0:20Factors, uncertainty and what to improve first
  4. 0:30Your questions