Construction Business Lunch × BENOR · Wednesday 9 December · BrusselsSave my seat 

Cut 10–30 % off your energy bill. Start with an audit.

Energy auditors on your site, every measure priced and ranked by payback, and the grants that lower the bill. AMUREBA-labelled in Wallonia. Mandatory every four years for large companies.

Take the 5-minute diagnostic

  • 300+ companies
  • 59 countries
  • 4.8/5 Capterra
Energy audit in the D-Carbonize Cockpit: consumption by use, measures ranked by payback, and a cumulative cash chart paid back in 1.6 years.
Illustrative example.

Is this for you?

Am I concerned?

What applies to you depends on where your sites are.

The EU now sets the obligation by energy use. France already applies it; Belgium and the Netherlands are still bringing it in. Pick your region and move the slider.

Annual energy use, all energies

Large company?

900 MWh≈ 3.2 TJ a year

10 TJEU rule, not yet in law85 TJISO 50001, not yet in law
  • In forceLarge companies: audit every four years, AMUREBA method.
  • In forceExempt: certified ISO 50001, or a carbon convention (convention carbone).
  • ComingComing: the EU energy-use thresholds, not yet in Walloon law.

Wallonia · 900 MWh · not a large company

Not mandatory

No audit required. It is still the fastest return.

An audit usually finds the cheapest savings first, and part of it can be funded.

Every 4 years
Large-company audit
11 Oct 2026
EU date for the first audit above 10 TJ

Large company: 250+ employees, or more than €50M turnover and €43M balance sheet. Sources: EU Directive 2023/1791 (art. 11), SPW Énergie, VEKA, Bruxelles Environnement, French Code de l’énergie (L233-1), RVO. November 2026.

What the audit finds

Where the energy goes, and what it pays to fix.

Our engineers walk your site, measure, and price every measure. Pick a use to see what we found, ranked by payback.

Example site · energy audit900 MWh a year (526 electricity, 374 gas) · €137k energy bill

On-site findings

Consumption by use

Process heat · 300 MWhCompressed air · 190 MWhSpace heating · 150 MWhLighting · 110 MWhMotors & pumps · 90 MWhOther · 60 MWh

  1. 1Fix compressed-air leaksCompressed air · −32 MWh electricity · invest €3k0.4 yr€7k0.4 yr · 7.1 t
  2. 2Boiler control optimisationProcess heat · −74 MWh gas · invest €6k1.4 yr€4.2k1.4 yr · 22.2 t
  3. 3LED lighting retrofitLighting · −38 MWh electricity · invest €14k1.7 yr€8.4k1.7 yr · 8.4 t
  4. 4Heat recovery on compressorsProcess heat · −135 MWh gas · invest €22k2.9 yr€7.7k2.9 yr · 40.5 t

Bigger levers such as rooftop solar or a heat pump go into the decarbonization plan.See the plan →

Cash over five years, before grants

4 measures: paid back in 1.6 years

TodayYear 1Year 2Year 3Year 4Year 5€0Paid back+€92k
To invest
€45k
Saved a year
€27k
CO₂e avoided a year
78 t
Of the energy bill
−20 %

Example: the site of our example company. Energy prices and emission factors from its 2025 data. Grants not included.

Grants

Part of the audit can be paid for.

The audit and the measures that follow can be partly funded. We check what applies to your sites and prepare the file with you.

RegionThe auditThe measuresStatus
WalloniaAMUREBA
FundedAudits and the studies that follow, with a labelled auditor
FundedFollow-up studies; investments via the federal deduction
AvailableOur auditors are AMUREBA-labelled
FlandersVLAIO
Not fundedSince February 2026
FundedStrategic ecology support, Ecologiepremie+
Available
Belgium, federalTax deduction
Not coveredThe deduction applies to investments
40 % deductionEnergy-saving investments, every company size, 2026
Available
BrusselsRenolution
SuspendedSince September 2026
SuspendedNo replacement decided yet
On hold

Sources: SPW Énergie (AMUREBA), VLAIO, vlaanderen.be (verhoogde investeringsaftrek), Bruxelles Environnement. November 2026. Rates and conditions change: we confirm them for your case.

How it works

What you get, and how (about a month)

Your consumption, your site and your contracts, then every measure priced and put in order.

Phase 01 of 05

Consumption

Our engineers

  • Bills, meters and load curves, site by site: where the energy goes, and when.

You receiveWhere your energy goes

Every measure priced in euros and in tonnes. Every figure traceable to its source.

Trusted for energy audits by

Frequently asked questions

How long does the audit take?

About a month, depending on the number of sites.

Are we concerned if we have fewer than 250 employees?

In Belgium, not yet: today the obligation applies to large companies. The EU now sets it by energy use, above 10 TJ a year (about 2.8 GWh), and the regions are bringing that into law. In France, it already applies from 2.75 GWh.

Can the audit be combined with a carbon footprint?

Yes. The same meter and invoice data feed your Scopes 1 and 2, and the audit’s measures go straight into your decarbonization plan.

Which standard do you follow?

The method your region requires: AMUREBA in Wallonia, VEKA in Flanders, the approved-auditor rules in Brussels. Our audits follow EN 16247.

Next step

We start from your sites, not from a spreadsheet.

A first 15-minute call to understand where you stand and what you need. No commitment.

  • 300+companies
  • 59countries
  • 4.8/5 Capterra