Cut 10–30 % off your energy bill. Start with an audit.
Energy auditors on your site, every measure priced and ranked by payback, and the grants that lower the bill. AMUREBA-labelled in Wallonia. Mandatory every four years for large companies.
- 300+ companies
- 59 countries
- 4.8/5 Capterra

Is this for you?
The audit is mandatory for you
Large companies audit every four years in all three Belgian regions. The EU is extending it to every company using more than 10 TJ a year.
Your energy bill is a board topic
Prices move every quarter. You want to know which part of the bill you can actually control.
You plan an investment
A heat pump, solar panels, heat recovery. You want to size it right, and know what pays back first.
Am I concerned?
What applies to you depends on where your sites are.
The EU now sets the obligation by energy use. France already applies it; Belgium and the Netherlands are still bringing it in. Pick your region and move the slider.
Annual energy use, all energies
900 MWh≈ 3.2 TJ a year
- In forceLarge companies: audit every four years, AMUREBA method.
- In forceExempt: certified ISO 50001, or a carbon convention (convention carbone).
- ComingComing: the EU energy-use thresholds, not yet in Walloon law.
Wallonia · 900 MWh · not a large company
Not mandatory
No audit required. It is still the fastest return.
An audit usually finds the cheapest savings first, and part of it can be funded.
- Every 4 years
- Large-company audit
- 11 Oct 2026
- EU date for the first audit above 10 TJ
Large company: 250+ employees, or more than €50M turnover and €43M balance sheet. Sources: EU Directive 2023/1791 (art. 11), SPW Énergie, VEKA, Bruxelles Environnement, French Code de l’énergie (L233-1), RVO. November 2026.
What the audit finds
Where the energy goes, and what it pays to fix.
Our engineers walk your site, measure, and price every measure. Pick a use to see what we found, ranked by payback.
Example site · energy audit900 MWh a year (526 electricity, 374 gas) · €137k energy bill
On-site findingsConsumption by use
Process heat · 300 MWhCompressed air · 190 MWhSpace heating · 150 MWhLighting · 110 MWhMotors & pumps · 90 MWhOther · 60 MWh
- 1Fix compressed-air leaksCompressed air · −32 MWh electricity · invest €3k0.4 yr€7k0.4 yr · 7.1 t
- 2Boiler control optimisationProcess heat · −74 MWh gas · invest €6k1.4 yr€4.2k1.4 yr · 22.2 t
- 3LED lighting retrofitLighting · −38 MWh electricity · invest €14k1.7 yr€8.4k1.7 yr · 8.4 t
- 4Heat recovery on compressorsProcess heat · −135 MWh gas · invest €22k2.9 yr€7.7k2.9 yr · 40.5 t
Bigger levers such as rooftop solar or a heat pump go into the decarbonization plan.See the plan →
Cash over five years, before grants
4 measures: paid back in 1.6 years
- To invest
- €45k
- Saved a year
- €27k
- CO₂e avoided a year
- 78 t
- Of the energy bill
- −20 %
Example: the site of our example company. Energy prices and emission factors from its 2025 data. Grants not included.
Grants
Part of the audit can be paid for.
The audit and the measures that follow can be partly funded. We check what applies to your sites and prepare the file with you.
Sources: SPW Énergie (AMUREBA), VLAIO, vlaanderen.be (verhoogde investeringsaftrek), Bruxelles Environnement. November 2026. Rates and conditions change: we confirm them for your case.
How it works
What you get, and how (about a month)
Your consumption, your site and your contracts, then every measure priced and put in order.
Phase 01 of 05
Consumption
Our engineers
- Bills, meters and load curves, site by site: where the energy goes, and when.
You receiveWhere your energy goes
Phase 02 of 05
On site
Our engineers + your teams
- Our engineers walk your lines with your teams: compressed air, heat, cold, motors, lighting, buildings.
You receiveWhat we found, use by use
Phase 03 of 05
Contracts
Our engineers
- What you pay, and what you could pay. Some savings need no investment.
You receiveYour contracts, read
Phase 04 of 05
Action plan
Our engineers
- Every measure priced: investment, savings, payback, CO₂ avoided, grants. In the format your region requires.
You receiveEvery measure priced
Phase 05 of 05
Roadmap
With you
- The measures in order of return, ready for your investment budget. The rest goes into your decarbonization plan.
You receiveA roadmap in order of return
Every measure priced in euros and in tonnes. Every figure traceable to its source.
Trusted for energy audits by
BTG
PLUO
Galvamétaux
Frequently asked questions
How long does the audit take?
About a month, depending on the number of sites.
Are we concerned if we have fewer than 250 employees?
In Belgium, not yet: today the obligation applies to large companies. The EU now sets it by energy use, above 10 TJ a year (about 2.8 GWh), and the regions are bringing that into law. In France, it already applies from 2.75 GWh.
Can the audit be combined with a carbon footprint?
Yes. The same meter and invoice data feed your Scopes 1 and 2, and the audit’s measures go straight into your decarbonization plan.
Which standard do you follow?
The method your region requires: AMUREBA in Wallonia, VEKA in Flanders, the approved-auditor rules in Brussels. Our audits follow EN 16247.
Next step
We start from your sites, not from a spreadsheet.
A first 15-minute call to understand where you stand and what you need. No commitment.
- 300+companies
- 59countries
- 4.8/5 Capterra